Tetra Tech RTW

RTW >Consulting Services > Aspen Consolidated Sanatation District

Aspen Consolidated Sanitation District
Wastewater Treatment Plant CPE & Predesign Study

Tetra Tech RTW completed a CPE for the existing 3.0-mgd plant, which was designed to treat domestic wastewater for the City of Aspen and the surrounding areas. Questions relative to existing available treatment capacity were evaluated. Problem items were identified, including limited capacity of the aerobic digesters, centrifuge, and aeration tank; lack of process automation, flexibility, and controllability; antiquated equipment highly susceptible to failure; headworks not up to current building and electrical codes; need for additional process control testing; inadequate odor control and septage processing facilities; and other more minor factors. A CCP was recommended to address certain issues that could be managed without major design and construction. We also recommended initiating a facility engineering study to address more complex, construction-related issues, both short- and long-term, that could upgrade the plant and more efficiently use to plant's design capacity.

The original plant design allowed for step-feed capabilities, but existing conditions precluded its usage, resulting in a 20% decrease in capacity. Tetra Tech RTW conducted a predesign study to examine short- and long-term corrective measures and improvements to the plant, including recapturing step-feed capabilities. This included evaluating equipment and alternatives according to economic and noneconomic criteria and ultimately narrowing to a single preferred management strategy best suited to the District's needs.

site search | contact us | help
Copyright © 2008 Rothberg, Tamburini & Winsor, Inc. (Tetra Tech RTW), A Tetra Tech Company, All Rights Reserved

Consulting Services
water, wastewater, environmental, civil, electrical, engineering, engineer, consulting, consultants, Colorado, Denver, Tetra Tech RTW, Rothberg, Tamburini, Winsor, Aspen Consolidated Sanitation District Wastewater Treatment Plant, CPE, Predesign Study, City of Aspen, treatment capacity, limited capacity, aerobic digesters, centrifuge, aeration tank, process automation, headworks, building codes, electrical codes, process control testing, odor control, septage processing facilities, CCP, design, construction, facility engineering study, predesign study, step-feed capabilities, district,