RTW >Engineering Services > Paradox Valley
Paradox Valley Salinity Control
Pumping & SCADA System Upgrades
Tetra Tech RTW provided assistance for this design-build
project that included replacement of three existing 40,000-lb triplex positive-displacement
piston pumps with four smaller quintuplex positive-displacement plunger
pumps. Design included modification of the existing brine injection facility
building by providing pump layout, piping configuration, pipe support requirements,
elevated FRP maintenance walkway details, and
miscellaneous appurtenances for operating pumps at injection pressures of
5,000 psi.
Tetra Tech RTW also updated logic in an existing PLC control system. The system comprised two sites (three PLCs) connected by an Allen-Bradley data highway. We replaced the existing computers and SCADA software at both sites and modified communication between the sites to allow control of the full facility from either site. We redesigned the SCADA system architecture, modified the PLC programming to implement new control features requested by the Bureau, and developed graphical interface screens using Intellution FIX DMACS software.
site search | contact us | help
Copyright © 2008 Rothberg, Tamburini & Winsor, Inc. (Tetra Tech RTW), A Tetra Tech Company, All Rights Reserved

